Pure Integral to UT-Dallas’ Global VDI Initiative


Customer:

University of Texas at Dallas’ storage system was a Sun/Oracle system that, at the time, performed adequately. But as they tried to take the next step, which was to add support for virtualization and a transition to 10 gigabit Ethernet networks. They expected storage to work the way it always had – just add more when you need it. To their surprise, they weren’t getting the performance they wanted. Between the network and the storage, they were getting a lot of latency.

Challenges:

  • Provide access to essential systems and applications
  • Replace computer lab model with flexible, efficient desktop virtualization
  • Support student devices, mobile

Use Case:

IT Transformation:

  • 8:1 data reduction
  • Latency time for engineering apps slashed
  • Recomposes completed in an hour

Business Transformation:

  • Student access to 35+ essential engineering applications and 3D programs
  • Global student access to computing resources
  • Maintenance no longer a disruption to student computing resources
800-379-7873 +44 20 3870 2633 +43 720882474 +32 (0) 7 84 80 560 +33 9 75 18 86 78 +49 89 12089 253 +353 1 485 4307 +39 02 9475 9422 +31 (0) 20 201 49 65 +46-101 38 93 22 +45 2856 6610 +47 2195 4481 +351 210 006 108 +966112118066 +27 87551 7857 +34 51 889 8963 +41 31 52 80 624 +90 850 390 21 64 +971 4 5513176 +7 916 716 7308 +65 3158 0960 +603 2298 7123 +66 (0) 2624 0641 +84 43267 3630 +62 21235 84628 +852 3750 7835 +82 2 6001-3330 +886 2 8729 2111 +61 1800 983 289 +64 21 536 736 +55 11 2655-7370 +52 55 9171-1375 +56 2 2368-4581 +57 1 383-2387

ピュア・ストレージ導入
簡単 3 ステップ

1. ニーズご相談

データ・ストレージのニーズについて個別にご相談をお受けしております。

2. PoC 実施

お客様にご協力いただき、専門チームが PoC(概念検証)を実施します。

3. ピュアへ移行・ピュアを導入

総所有コスト(TCO)削減効果を実証し、移行・導入のお手伝いをいたします。